Gibb River to drill at the Edjudina!

 

Phase 2 Drilling in the November 

Gibb River Diamonds announced that the Phase 2 drilling campaign at the Edjudina Gold Project, WA is due to commence in the first week of November 2020. A contract has been signed with a Kalgoorlie based drilling services company to provide aircore drilling services to GIB.

The primary aim of this Phase 2 aircore drilling program is to test strike and depth extensions to the newly discovered Neta Lodes mineralisation at Edjudina, this includes, 

1: On-strike extensions to the north of Neta Lodes under areas of calcrete cover, 2: On-strike extensions to the south of Neta Lodes up to the GIB tenement boundary 60 metres to the south of GIB’s most south-westerly mineralised hole1 & 3: Depth extensions to the Neta Lodes discovery. 

The recent positive drilling results at the Gawler Prospect will also be followed up with further drilling as time allows.







Comments

Popular posts from this blog

GJEPC championing talent, celebrate design & craftsmanship

BFC & Pandora announce the fashion awards

Senco Gold & Diamonds Launches Special Jewellery Line to Commemorate Ram Mandir Pran Pratistha